Stayery

Bielefeld, 德国

淋浴区只有几步之遥。比勒费尔德的服务式公寓依靠的是贝特的新安装方案。

Shower space in just a few steps: Bielefeld boarding house relies on new installation solution by Bette

The second boarding house of the Stayery brand is to be built in the immediate vicinity of Bielefeld main station, after the Berlin branch commenced operations at the beginning of February 2019. As in the capital, the offer of the 126 serviced apartments in Bielefeld is aimed primarily at young business travellers who want to combine the convenience of a short-term apartment with the service of a hotel. The installation of the shower trays in the Bielefeld building is just as modern as the concept: in order to make the installation faster, cheaper and standard compliant, a new combination solution by Bette is to be used here in the Easy Connect installation box and the minimum tray carrier.

熨斗铺设完毕后,Bette的Easy Connect安装盒。盖子可以保护里面的排水管不受灰尘和损坏。
1. the installation box Easy Connect from Bette after the screed has been laid. The cover protects the drain inside from dirt and damage.
安装箱被切割成所需的高度。安装高度可在105和205毫米之间灵活选择。
2. the installation box is cut to the required height. The installation height is flexible between 105 and 205 mm and the box does not need to be additionally lined.
所提供的和预装的密封套筒只需粘在安装盒内即可。
3. the supplied and pre-assembled sealing sleeve is simply glued into the installation box.
在瓦工涂抹密封浆料后,根据DIN 18534标准,Easy Connect安装盒被整合到粘合密封中。
4. after the tiler has applied the waterproofing slurry, the installation box Easy Connect integrated into the composite waterproofing in accordance with DIN 18534.
在放置淋浴盘之前,必须安装排水管。位于比勒费尔德的STAYERY公司依靠自清洁的BetteSolid排水装置。
5. before the shower tray is fitted, the waste must be made. The Bielefeld STAYERY uses BetteSolid diesel self-cleaning drain fittings for this.
BetteMinimum浴缸支架已经在工厂与淋浴盘预先组装好了。安装人员只需涂抹粘合剂并将淋浴盘粘在砂浆上。
6. the minimum support was already pre-assembled ex works with the shower tray. The installer only has to apply the adhesive and glue the shower tray to the screed.
拧下排水管,最后检查--准备好了!
7. tighten the waste, final check - ready!
由于Bette的巧妙组合方案,126个淋浴位置在比勒费尔德的STAYERY安全地实现了,节省了时间并符合了标准。
8. 126 shower areas were realised in the Bielefeld STAYERY in a time-saving and standard-compliant manner thanks to Bette's clever combination solution.

使用的产品

相关参考资料

发现更多项目

Boutique Hotel K7
Bad Nauheim, 德国

Mittermeiers Alter Ego
Rothenburg, 德国

Stilwerk Hotel Heimhude
Hamburg, 德国

Boutique Hotel K7
Bad Nauheim, 德国

Mittermeiers Alter Ego
Rothenburg, 德国

Stilwerk Hotel Heimhude
Hamburg, 德国

The Bull Inn
Totnes, 大不列颠

Tirol Lodge
Ellmau, 奥地利